top of page


During this production I was responsible for working with a crew to cut and assemble the steel wall, construct the stage left column bases, and rig the points at the top of the columns in-space.
I was also a part of the load-in & load-out crew for this production.
This was a fantastic learning experience where I was able to work with different rigging techniques.
![]() Wall Layout | ![]() Hanging Steel Wall | ![]() Completed Wall | ![]() Facing for the Columns |
|---|---|---|---|
![]() Column Assembly | ![]() Rigged Back of Column | ![]() Front Side of Column | ![]() Hanging the Masking |
![]() Finished Set SL | ![]() Full Finished Set | ![]() Production Photo | ![]() Production Photo |
![]() Production Photo | ![]() Production Photo |
bottom of page













